Among the different options for LNG, water tank, or power station construction, there is one goal at the top of the list: to reserve water, store, or generate energy as soon as possible. While goals are extremely simple to set, solutions to achieve them are equally challenging. In addition to the diversity of geological and topographical conditions, other major challenges include specific provisions for specific and perfectly coordinated times for different steps and supplier companies.
Project-specific design implementation reliability where for non-tie wall structure curve wall structure etc.. Cost determination thanks to MAUP competitive materials and well-engineered planning. Work quickly and efficiently with optimized molding solutions by pre-fabricated steel waler in the factory and customized shaping wood on site. Comprehensive workplace safety with compatible work platforms under MAUP site engineer's supervision.
BASE 20 formwork, HETO Frame formwork, Jump formwork CB240, scaffolding system for both façade platform and shoring support are all ready to be applied in order to deliver success for your project.